in

Ghana Highway Authority orders traders to leave East Legon tunnel

Traders who have taken over the edges of the road leading to the tunnel that connects East Legon to the Spintex in Accra have been given up to July 15 to evacuate their wares or be forced out.

The move is to pave way for expansion works to begin on the tunnel.
The affected persons include petty traders, flower and pots dealers, as well as, a construction company (name withheld).

The Ghana Highway Authority is expected to begin the expansion work right after the traders have moved.

Mr Kwasi Amoako-Atta, the Ministry of Roads and Highways announced during a recent tour that another tunnel would be constructed to ease the vehicular traffic for motorists on that route.

“Within the next six months, I have directed the team to create a second tunnel so that there will be continuous flow of traffic instead of the current alternating flow that we are experiencing.
Once we have the two systems in place, this traffic that occur will be a thing of the past,” the minister said.

Written by Web Master

Leave a Reply

Your email address will not be published. Required fields are marked *

GIPHY App Key not set. Please check settings

Most of Akufo-Addo’s utterances are wrong – Prophet Badu Kobi

Old Achimota Basic School Students Visit John Mahama (pictures)